PLEASE NOTE: ESA is now part of the American Clean Power Association (ACP). This website material is not regularly updated and is for archival and reference purposes only. Please visit cleanpower.org for more information.

January 21, 2020

Proposed 2.2 GW Storage Project Plans to Use Navajo Coal Station Power-Lines

A proposal to build a 2.2 GW pumped hydro storage facility in Arizona moved one step closer to reality last week, after the Federal Energy Regulatory Commission (FERC) accepted its application for a preliminary permit. The $3.6 billion project would be built at a U.S. Bureau of Reclamation reservoir on the Colorado River, and rely on transmission infrastructure that was part of the retired Navajo Generating Station coal facility. It would deliver power to Los Angeles, Las Vegas and Phoenix.

Read More


Back to Energy Storage in the News

Become a Member

Join ESA - the National Network of Energy Storage Stakeholders

Learn More About Membership

ESA ACP

ESA is Merging with ACP

Effective January 2022

Read More